Purpose: To understand how much revenue you have posted on the specific rate.
Example:
5 hours of crane = 500,-
10 hours excavator = 750,-
Material = 250,-
Invoice is sent as: 2000,-, 1 line
Underlying items are the above.
Turnover to statistics:
500 goes to crane
750 goes to excavator
250 goes to material
The difference (minus or plus) goes to the invoice line on which the invoice was posted.
Consequence: in the accounting system there are different results than in TimeKing. Seems therefore good to make this a setting.